Exhaust Silencer Reverse Engineering & Fabrication Detailing | Power Sector

Project/Site Name: Keadby Power Station Sector: Power Services: Reverse Engineering of Pressure Vessel / Fabrication Drawings Amrose Associates was engaged to support reverse engineering works at Keadby Power Station involving a major exhaust silencer within the power generation system. The silencer plays an important role in controlling and reducing noise as exhaust gases move through […]

Read More… from Exhaust Silencer Reverse Engineering & Fabrication Detailing | Power Sector

Tower Crane Lateral Restraint Design

Project/Site Name: Tottenham Hale Sector: Buildings Scope of Work: Tower Crane Ties / Structural Steel Design & Detailing   At Tottenham Hale, Amrose Associates were appointed to design a steel restraint system to tie a tower crane installed within the concrete core of a high-rise development. As the core structure increased in height, the crane […]

Read More… from Tower Crane Lateral Restraint Design

Pipe restraints and cold pull temporary works design at West Burton B Power Station

Project/Site Name: West Burton B Power Station Sector: Power Scope of Work: Pipework Cold-pull Restraint / Structural Steel Design Overview At West Burton B Power Station, Amrose Associates was appointed by Altrad Babcock on behalf of West Burton Energy Ltd to design temporary restraint systems for high-pressure, high-temperature steam pipework repairs. The objective was to […]

Read More… from Pipe restraints and cold pull temporary works design at West Burton B Power Station

Temporary Works for East Coast Main Line Bridge Project

Project/Site Name: York Central Sector: Rail Scope of Work: Rebar Stability / Formwork & Falsework / Scaffolding / Working Platforms / Contractors Responsible Engineer (CRE) Project Overview The York Central scheme includes a £100m infrastructure package delivered by John Sisk & Son through the YORCivil Framework. The works feature a new road bridge and footbridge […]

Read More… from Temporary Works for East Coast Main Line Bridge Project

Interim strengthening of a corroded steel chimney

Project/Site Name: Verallia Knottingley Sector: Manufacturing Scope of Work: Corroded Chimney Assessment & Strengthening   The Challenge Corrosion was identified in the upper three sections of a steel chimney at a glass bottle manufacturing facility in Yorkshire, leading to reduced wall thickness and a loss of structural capacity. The deterioration was most critical at the […]

Read More… from Interim strengthening of a corroded steel chimney

Steel Crane Spreader Mat Structural Verification

Project/Site Name: Multiple Sector: All Scope of Work: Crane outrigger load spreading mat   Amrose Associates was appointed to verify the structural performance of a steel crane spreader mat to make sure it could safely distribute loads under varying ground conditions and operational scenarios. The Challenge Preliminary design calculations had been completed but further analysis […]

Read More… from Steel Crane Spreader Mat Structural Verification

Temporary Works Design for Fall Restraint System in Hull

Project/Site Name: A63 Castle Street, Hull Sector: Highways Scope of Work: Fall Restraint System Design   Project overview Amrose Associates was appointed as temporary works designer to develop a fall restraint system to support a road scheme in Hull where National Highways is creating a new junction, lowering the level of the A63 Castle Street […]

Read More… from Temporary Works Design for Fall Restraint System in Hull

Temporary works design at the Saudi Aramco Al-Jubayl Refinery

Project/Site Name: Saudi Aramco Al-Jubayl Refinery Sector: Oil & Gas Scope of Work: Temporary Access Design   Amrose Associates was appointed as Temporary Works Designer to develop a bespoke ladder beam support arrangement for lifting and access operations at height at the Saudi Aramco Al-Jubayl Refinery. The challenge The permanent structure didn’t provide suitable attachment […]

Read More… from Temporary works design at the Saudi Aramco Al-Jubayl Refinery

Drax Power Station: Mill Bay Steelwork & Track Hopper House

Project/Site Name: Drax Power Station Sector: Power Scope of Work: Structural Asset Inspections   Challenge Drax required comprehensive inspections of historic steelwork at its Mill Bay and Track Hopper House structures. Access was complex and required precision inspection to assess condition and safety without disrupting ongoing operations. Our approach Amrose’s experienced structural engineers conducted detailed […]

Read More… from Drax Power Station: Mill Bay Steelwork & Track Hopper House

Principal Gas Transmission Asset Inspections: Pipe Bridges (Cadent)

Project/Site Name: Multiple Cadent Asset Sites Sector: Gas Transmission Scope of Work: Structural Asset Inspections   Challenge Cadent required principal inspections of multiple pipe-bridge structures across its gas transmission network as part of a five-year inspection cycle. The assets, some spanning over water, presented significant access and safety challenges. Our approach Amrose Associates deployed qualified […]

Read More… from Principal Gas Transmission Asset Inspections: Pipe Bridges (Cadent)