Structural assessment and roof strengthening at warehouse site

Amrose Associates was appointed to support proposed roof improvement works at one of LyondellBasell’s sites, a live manufacturing and storage facility handling delicate and flammable materials. Ensuring structural safety and continuity of operations was therefore critical. Challenge There were no archive structural drawings or design records for the existing building and the project was further […]

Read More… from Structural assessment and roof strengthening at warehouse site

Temporary Works Coordination for Liverpool Crown Court

Amrose Associates was appointed as Temporary Works Coordinator (TWC) for safety-critical RAAC propping works at Liverpool Crown Court. Project Summary Following the identification of Reinforced Autoclaved Aerated Concrete (RAAC) within the building structure, a material now recognised as presenting an elevated risk of sudden and progressive structural failure, urgent remediation measures were needed. The priority […]

Read More… from Temporary Works Coordination for Liverpool Crown Court

Temporary Works Coordination for Victoria Law Courts, Birmingham

Amrose Associates was appointed to deliver Temporary Works Coordination and technical governance for the external elevation repair works at the Grade 1 listed Victoria Law Courts, on Corporation Street, Birmingham.  Project Summary The project forms part of a critical programme of heritage protection and building-envelope stabilisation. The programme of works aims to protect the building […]

Read More… from Temporary Works Coordination for Victoria Law Courts, Birmingham

Pre-Demolition and Mothballing Engineering | Power Sector

Client: SSE Thermal Services: Industrial Decommissioning, Pre-Demolition Engineering, Asset Maintenance Amrose Associates was appointed by SSE Thermal to undertake pre-demolition civil and structural appraisals at Tarbert Power Station and Great Island Power Station in Ireland. Both sites are permanently shut down and mothballed, with demolition anticipated at an undefined point in the future. The challenge […]

Read More… from Pre-Demolition and Mothballing Engineering | Power Sector

Design Development with Falcon Tower Crane Services

In partnership with Falcon Tower Crane Services, we recently developed and improved an innovative in-core climbing tower crane tie design, solving real practical challenges, improving safety and creating a solution ready for future projects. The Challenge Real-world engineering and design development is about collaboration, iteration and (sometimes) physically testing concepts to prove performance prior to […]

Read More… from Design Development with Falcon Tower Crane Services

Network Rail Assurance Process for Temporary Works

Delivering successful rail projects depends on safe and reliable temporary works. From scaffolding and formwork to working platforms and excavations, these essential elements keep construction moving, but if not properly managed, they introduce serious risks to both safety and cost. That’s why Network Rail has developed a robust assurance process to oversee temporary works across […]

Read More… from Network Rail Assurance Process for Temporary Works

Decommissioning and Demolition of a 1960s Coal Fired Power Station

Demolition of 1960s power station UK

Back in the 1960s, the UK was rapidly expanding its coal-fired generation capacity. Power stations of this era were built to an impressive scale. In the case we’re looking at in this article, we’re talking about four pulverised fuel boilers producing over 100 kg/s of steam each, turbo-alternators delivering nearly 500 MW of electricity and […]

Read More… from Decommissioning and Demolition of a 1960s Coal Fired Power Station

Demolition engineering support: Complex structure in urban environment

Project Overview Amrose Associates was appointed to deliver demolition engineering support for a high-risk site located in a densely populated urban area. The structure presented a series of complex challenges, including partial demolition adjacent to live highways and occupied buildings, limited record data and the need for minimal disruption to neighbouring stakeholders. Our Approach We […]

Read More… from Demolition engineering support: Complex structure in urban environment

Safe deconstruction of Intergrid school buildings

Amrose Associates has been engaged by a number of main contractors to design the safe deconstruction of high risk Intergrid buildings. We have been providing specialist temporary works engineering to identify which of the defective postwar school buildings have what’s known as Intergrid system-built structure. What are Intergrid system-built schools? Intergrid is one of two […]

Read More… from Safe deconstruction of Intergrid school buildings

Our Complex Lifting Design Solutions

As construction projects grow in complexity, so too do the demands of lifting operations. At Amrose Associates, we specialise in designing tailored lifting solutions that meet challenging requirements around weight, space, and safety. Our mechanical and structural engineers work closely with project teams to manage risks, avoid delays, and keep operations running smoothly. Here are […]

Read More… from Our Complex Lifting Design Solutions