Cottam Development Centre: Handrail Compliance Inspections (Uniper)

Project/Site Name: Cottam Development Centre Sector: Power Scope of Work: Structural Asset Inspections   Challenge Uniper required a full suite of edge protection and handrail compliance inspections at the Cottam Development Centre Power Station to ensure all access areas met safety and design standards. The project needed a reliable partner capable of interpreting complex client […]

Read More… from Cottam Development Centre: Handrail Compliance Inspections (Uniper)

Structural assessment and roof strengthening at warehouse site

Project/Site Name: Lyondell Basell Sector: Manufacturing Scope of Work: Site Survey / Asset Inspection / Structural Design Amrose Associates was appointed to support proposed roof improvement works at one of LyondellBasell’s sites, a live manufacturing and storage facility handling delicate and flammable materials. Ensuring structural safety and continuity of operations was therefore critical. Challenge There […]

Read More… from Structural assessment and roof strengthening at warehouse site

Temporary Works Coordination for Liverpool Crown Court

Project/Site Name: Liverpool Crown Courts Sector: Buildings Scope of Work: Temporary Works Coordinator (TWC) Services   Amrose Associates was appointed as Temporary Works Coordinator (TWC) for safety-critical RAAC propping works at Liverpool Crown Court. Project Summary Following the identification of Reinforced Autoclaved Aerated Concrete (RAAC) within the building structure, a material now recognised as presenting […]

Read More… from Temporary Works Coordination for Liverpool Crown Court

Temporary Works Coordination for Victoria Law Courts, Birmingham

Project/Site Name: Victoria Law Courts Sector: Buildings Scope of Work: Temporary Works Coordinator (TWC) Services Amrose Associates was appointed to deliver Temporary Works Coordination and technical governance for the external elevation repair works at the Grade 1 listed Victoria Law Courts, on Corporation Street, Birmingham.  Project Summary The project forms part of a critical programme […]

Read More… from Temporary Works Coordination for Victoria Law Courts, Birmingham

Pre-Demolition and Mothballing Engineering | Power Sector

Project/Site Name: Tarbert Power Station and Great Island Power Station Sector: Power Scope of Work: Demolition Methodology / Asset Inspection & advice   Amrose Associates was appointed by SSE Thermal to undertake pre-demolition civil and structural appraisals at Tarbert Power Station and Great Island Power Station in Ireland. Both sites are permanently shut down and […]

Read More… from Pre-Demolition and Mothballing Engineering | Power Sector

Design Development with Falcon Tower Crane Services

Project/Site Name: Jubilee Way Sector: Buildings Scope of Work: Tower Crane Ties / Structural Steel Design & Detailing In partnership with Falcon Tower Crane Services, we recently developed and improved an innovative in-core climbing tower crane tie design, solving real practical challenges, improving safety and creating a solution ready for future projects. The Challenge Real-world […]

Read More… from Design Development with Falcon Tower Crane Services

Network Rail Assurance Process for Temporary Works

Project/Site Name: All Rail Projects Sector: Rail Scope of Work: Network Rail Asset Protection   Delivering successful rail projects depends on safe and reliable temporary works. From scaffolding and formwork to working platforms and excavations, these essential elements keep construction moving, but if not properly managed, they introduce serious risks to both safety and cost. […]

Read More… from Network Rail Assurance Process for Temporary Works

Decommissioning and Demolition of a 1960s Coal Fired Power Station

Demolition of 1960s power station UK

Project/Site Name: Skelton Grange B Power Station Sector: Power Scope of Work: Demolition Method & Sequencing / Temporary Stability Assessments   Back in the 1960s, the UK was rapidly expanding its coal-fired generation capacity. Power stations of this era were built to an impressive scale. In the case we’re looking at in this article, we’re […]

Read More… from Decommissioning and Demolition of a 1960s Coal Fired Power Station

Demolition engineering support: Complex structure in urban environment

Project/Site Name: Multiple Sector: Demolition Scope of Work: Demolition Method & Sequencing / Temporary Stability Assessments   Project Overview Amrose Associates was appointed to deliver demolition engineering support for a high-risk site located in a densely populated urban area. The structure presented a series of complex challenges, including partial demolition adjacent to live highways and occupied […]

Read More… from Demolition engineering support: Complex structure in urban environment

Safe deconstruction of Intergrid school buildings

Project/Site Name: Whitley Bay High School / Fred Longworth High School / Byrchall High School Sector: Buildings Scope of Work: Demolition Method & Sequencing / Temporary Building Stabilisation & Propping   Amrose Associates has been engaged by a number of main contractors to design the safe deconstruction of high risk Intergrid buildings. We have been […]

Read More… from Safe deconstruction of Intergrid school buildings