Temporary Works | Building End Gable Façade Design | School Deconstruction

Client Site: Whitley Bay High School Services: Temporary Works Design, Scaffold Design, Deconstruction Engineering Amrose Associates was appointed to design a temporary end gable façade to screen a three storey tower block during its phased deconstruction. The challenge The project presented a number of complex engineering challenges and the design needed to account for: The […]

Read More… from Temporary Works | Building End Gable Façade Design | School Deconstruction

Concert Staging Engineering Verification | Live Events Sector

Client: Confidential Global Staging Contractor Services: Structural Verification, 3D Structural Analysis, Temporary Works Assessment Amrose Associates was appointed to provide independent engineering verification for a sophisticated concert staging arrangement in the live events sector. The staging contractor had developed the concept design and required independent numerical verification to confirm that the proposed configuration was structurally […]

Read More… from Concert Staging Engineering Verification | Live Events Sector

Exhaust Silencer Reverse Engineering & Fabrication Detailing | Power Sector

Client Site: Keadby Power Station Fabrication Contractor: Multiweld UK Services: Reverse Engineering Support, 3D Modelling, Detailed Fabrication Drawings Amrose Associates was engaged to support reverse engineering works at Keadby Power Station involving a major exhaust silencer within the power generation system. The silencer plays an important role in controlling and reducing noise as exhaust gases […]

Read More… from Exhaust Silencer Reverse Engineering & Fabrication Detailing | Power Sector

Tower Crane Lateral Restraint Design

At Tottenham Hale, Amrose Associates were appointed to design a steel restraint system to tie a tower crane installed within the concrete core of a high-rise development. As the core structure increased in height, the crane climbed with it but beyond a certain point, base stability alone is no longer sufficient. Additional lateral restraint was […]

Read More… from Tower Crane Lateral Restraint Design

Pipe restraints and cold pull temporary works design at West Burton B Power Station

Overview At West Burton B Power Station, Amrose Associates was appointed by Altrad Babcock on behalf of West Burton Energy Ltd to design temporary restraint systems for high-pressure, high-temperature steam pipework repairs. The objective was to enable safe repair works while maintaining the integrity of the existing pipework stress system. The Challenge The pipework formed […]

Read More… from Pipe restraints and cold pull temporary works design at West Burton B Power Station

Temporary Works for East Coast Main Line Bridge Project

Project Overview The York Central scheme includes a £100m infrastructure package delivered by John Sisk & Son through the YORCivil Framework. The works feature a new road bridge and footbridge spanning the East Coast Main Line, forming a key gateway into the York Central development. Amrose was appointed to provide temporary works design support to […]

Read More… from Temporary Works for East Coast Main Line Bridge Project

Interim strengthening of a corroded steel chimney

Client: Verallia Knottingley Service: Structural Assessment & Temporary Works Design The Challenge Corrosion was identified in the upper three sections of a steel chimney at a glass bottle manufacturing facility in Yorkshire, leading to reduced wall thickness and a loss of structural capacity. The deterioration was most critical at the bolted flange connections, which are […]

Read More… from Interim strengthening of a corroded steel chimney

Steel Crane Spreader Mat Structural Verification

Amrose Associates was appointed to verify the structural performance of a steel crane spreader mat to make sure it could safely distribute loads under varying ground conditions and operational scenarios. The Challenge Preliminary design calculations had been completed but further analysis was needed to confirm the mat’s load distribution capability and structural behaviour in real-world […]

Read More… from Steel Crane Spreader Mat Structural Verification

Temporary Works Design for Fall Restraint System in Hull

Temporary Works Design for Fall Restraint System in Hull Client: Sword Construction UK Ltd Location: A63 Castle Street Project overview Amrose Associates was appointed as temporary works designer to develop a fall restraint system to support a road scheme in Hull where National Highways is creating a new junction, lowering the level of the A63 […]

Read More… from Temporary Works Design for Fall Restraint System in Hull

Temporary works design at the Saudi Aramco Al-Jubayl Refinery

Amrose Associates was appointed as Temporary Works Designer to develop a bespoke ladder beam support arrangement for lifting and access operations at height at the Saudi Aramco Al-Jubayl Refinery. The challenge The permanent structure didn’t provide suitable attachment points or safe access for the planned lifting works. A temporary solution was needed that could support […]

Read More… from Temporary works design at the Saudi Aramco Al-Jubayl Refinery