Overview At West Burton B Power Station, Amrose Associates was appointed by Altrad Babcock on behalf of West Burton Energy Ltd to design temporary restraint systems for high-pressure, high-temperature steam pipework repairs. The objective was to enable safe repair works while maintaining the integrity of the existing pipework stress system. The Challenge The pipework formed […]
Read More… from Pipe restraints and cold pull temporary works design at West Burton B Power Station
