Project Name / Site: Cooling Tower 1B, Drax Power Station, North Yorkshire

Sector: Energy & Power Generation

Scope of Work: Temporary Works

Background

Amrose Associates was commissioned to provide specialist engineering expertise to support a major inspection and concrete repair programme on Cooling Tower 1B at Drax Power Station in North Yorkshire.

The works needed specialist temporary access systems to enable operatives to safely reach the full height and circumference of the vast cooling tower so that they could carry out detailed inspection and subsequent concrete repairs.

Our role was to provide independent temporary works design checks for the proposed access arrangements, initially focusing on the Cat Head materials-handling rig and cradle suspension support brackets.

As the project progressed, the scope was extended to include steeplejack ladders and the restraint wire anchor scaffold used to stabilise the access cradles.

The Challenge

Providing safe access to a cooling tower presents significant engineering challenges due to the structure’s height, curved geometry and the complexity of the access arrangements required.

The temporary works needed to accommodate operatives, materials and equipment while ensuring that loads were safely transferred through the various supporting and restraint systems.

A further challenge was that several elements of the temporary works remained under development during the checking stage. As the proposals were refined, Amrose needed to respond to design changes and adapt its independent checks accordingly.

This required a flexible, collaborative approach to maintain progress while ensuring the proposed systems received appropriate engineering scrutiny.

How We Helped

Amrose Associates provided independent engineering checks across four key elements of the temporary works:

  • Cat Head materials-handling rig: Reviewing the proposed structural arrangement, load paths, stability and supporting components to assess the rig’s capacity to accommodate the intended materials-handling operations.
  • Cradle suspension support brackets: Checking the structural adequacy of the brackets, including applied loads, connections and the transfer of forces into the supporting structure.
  • Steeplejack ladders: Assessing the proposed ladder arrangements and their supporting components as part of the wider access system.
  • Restraint wire anchor scaffold: Reviewing the scaffold arrangement used to stabilise the suspended access cradles, considering restraint forces, stability and load transfer.

Throughout the project, Amrose worked closely with Delta International Engineering, responding to updated proposals, incorporating design developments into its checking activities and understanding how the access systems would be installed and used on site.

The Outcome

Amrose provided independent engineering scrutiny across the principal temporary works systems supporting the Cooling Tower 1B inspection and repair programme.

By responding to evolving designs and an expanding scope of work, the team helped Delta International Engineering progress its access proposals with greater confidence in their structural adequacy and suitability for the intended operations.

The project demonstrates Amrose’s expertise in specialist temporary works design checking, particularly on complex industrial structures where access requirements, construction methodology and engineering constraints must be carefully coordinated.

It also highlights the value of early collaboration and responsive technical support in helping contractors develop practical, safe and buildable temporary works solutions.

Need independent temporary works design checks for a complex project? Amrose Associates provides practical, technically rigorous engineering support for contractors working on challenging structures and construction projects across the UK. Contact our team on 0113 391 9840 or email enquiries@amroseassociates.com to discuss your requirements.