Client: Uniper
Location: Cottam Development Centre Power Station
Service: Engineering-led compliance inspections
Challenge
Uniper required a full suite of edge protection and handrail compliance inspections at the Cottam Development Centre Power Station to ensure all access areas met safety and design standards. The project needed a reliable partner capable of interpreting complex client procedures and national standards, while delivering efficient, large-scale inspection reporting.
Our approach
Amrose Associates deployed qualified structural engineers to interpret Uniper’s inspection procedures and relevant design codes.
We developed a bespoke inspection methodology, including detailed planning, asset tagging for traceability, and a structured approach to documenting compliance.
Non-compliant handrails were risk-assessed and categorised based on severity, with clear, practical remedial recommendations provided for each issue.
Outcome
Our engineering-led process enabled reliable, large-scale compliance checks with:
•Clear, structured reporting for ongoing asset management
•Improved auditability and data traceability
•Risk-based prioritisation for future maintenance and upgrades
Result: A fully traceable and compliant inspection system delivering clarity, efficiency and confidence for Uniper’s asset safety programme.
